SW Manual Machines # SW1 – SW2416
TABLE OF CONTENTS
Installation of the Trap Machine and Pump….…………………………………………………….page 1
Replacement of Turret……………………………………………………………………………….page 3
Mounting the Power Control Box …………………………………………………………………..page 4
Connecting the Trap to the Power Source ………………………………………………………..page 4
How the Pat-Trap Automatic Doubles Machine Works…………………………………………..page 6
Turning Your Pat-Trap Machine On……………………………………………………………….page 10
Turning Your Pat-Trap Machine Off……………………………………………………………….page 10
Loading the Pat-Trap Machine……………………………………………………………………..page 10
Pat-Trap Singles……………………………………………………………………………………..page 12
Pat-Trap Doubles…………………………………………………………………………………….page 14
Adjustment for Doubles……………………………………………………………………………..page 14
Pat-Trap Wobble…………………………………………………………………………………….page 16
Change over to Wobble…………………………………………………………………………….page 16
Height Adjustment for Singles/Doubles on the Wobble…………………………………………page 16
Setting Distance/Speed……………………………………………………………………………..page 17
Field – Angle Adjustment (Sliding Switch Bar Style)…………………………………………….page 18
Adjusting Height of Targets…………………………………………………………………………page 19
Angle Adjustments………………………………………………………………………………….,page 19
Adjusting Switch #4 (Proximity Switch Style)……………………………………………………..page 21
Installing Plastic Pinion Backstop, Spring and #4 Switch Bracket (#4 Switch Style)…………page 23
Adjusting the #4 Switch (#4 Style)………………………………………………………………….page 25
Roller Plate Maintenance……………………………………………………………………………page 26
Target rush Maintenance…………………………………………………………………………….page 27
Target Guide Spring Position………………………………………………………………………..page 28
Cold Weather Adjustment – Temperature/ Release Time……………………………………….page 29
Stopping the Throw Arm on the Brake……………………………………………………………..page29
Adjusting Release Tine & Correction of Cycling Problem………………………………………..page 29
Assembly of Throw Arm Brake……………………………………………………………………..page 31
Throw Arm Brake Installation……………………………………………………………………….page 32
Throw Arm Brake Maintenance…………………………………………………………………….page 32
Throw Arm Backstop…………………………………………………………………………………page 33
Installation of Throw Arm……………………………………………………………………………page 34
Installation of the “X” Doubles Finger………………………………………………………………page 35
Disconnecting the Main Spring……………………………………………………………………..page 37
Assembly/Installation of the Uni-Band (Main Spring)……………………………………………page 38
Installation of Coil Spring……………………………………………………………………………page 39
Removal of the Throw Arm / Turret Valve…………………………………………………………page 40
Replacement of Oscillation Cylinder……………………………………………………………….page 41
Hydraulic Cylinder for Wobble……………………………………………………………………..page 43
Throw Arm Shaft Bearing Maintenance…………………………………………………………..page 44
Procedure to Flush Hydraulic Oil………………………………………………………………….page 45
Pump Motor Maintenance………………………………………………………………………….page 46
Wiring Guide for #2 and #3 Proximity Switches………………………………………………….page 47
Wiring Guide for Standard Shift Valve…………………………………………………………….page 48
Wiring Guide of Soft Shift Valve……………………………………………………………………page 49
Wiring Guide for Throw Arm / Turret Valve……………………………………………………….page 50
Wiring Guide for #11 and #12 Proximity Switches………………………………………………page 51
Wiring Guide for Wobble Hydraulic Cylinder…………………………………………………….page 52
Wiring Guide for Pat-Trap Machine……………………………………………………………….page 53